FINAL REPORT REAL-TIME TIDE MONITORING AND ANALYSIS FOR CPOC ADC-J OFFSHORE STRUCTURE (JACKET) LOADOUT OPERATION AT MMHE EAST YARD, PASIR GUDANG, JOHOR (18-21 JUN 2024)
Clasified/Technical Report CO-AUTHOR
|
2025 |
FINAL REPORT REAL-TIME TIDE MONITORING AND ANALYSIS FOR CPOC ADE-T OFFSHORE STRUCTURE (TOPSIDE) LOADOUT OPERATION AT MMHE WEST YARD, PASIR GUDANG, JOHOR.
Clasified/Technical Report CO-AUTHOR
|
2025 |
FINAL REPORT REAL-TIME TIDE MONITORING AND ANALYSIS FOR CPOC JKC-J OFFSHORE STRUCTURE (JACKET) LOADOUT OPERATION AT MMHE EAST YARD, PASIR GUDANG, JOHOR. (CPOC-06-JKC-J) 23RD - 26TH APRIL 2025
Clasified/Technical Report CO-AUTHOR
|
2025 |
FINAL REPORT REAL-TIME TIDE MONITORING AND ANALYSIS FOR CPOC ADD-T OFFSHORE STRUCTURE (TOPSIDE) LOADOUT OPERATION AT MMHE WEST YARD, PASIR GUDANG, JOHOR.
Clasified/Technical Report CO-AUTHOR
|
2025 |
FINAL REPORT REAL-TIME TIDE MONITORING AND ANALYSIS FOR CPOC JKD-T OFFSHORE STRUCTURE (TOPSIDE)
LOADOUT OPERATION AT MMHE WEST YARD, PASIR GUDANG, JOHOR.
Clasified/Technical Report CO-AUTHOR
|
2025 |
FINAL REPORT BATHYMETRY STUDY FOR LOADOUT OPERATION MONITORING AT QUAY 6, MMHE WEST YARD PASIR GUDANG, JOHOR.
Clasified/Technical Report CO-AUTHOR
|
2025 |
FINAL REPORT REAL-TIME TIDE MONITORING AND ANALYSIS FOR CPOC JKD-J OFFSHORE STRUCTURE (JACKET) LOADOUT OPERATION AT MMHE EAST YARD, PASIR GUDANG, JOHOR (13TH TO 16TH JULY 2024)
Clasified/Technical Report CO-AUTHOR
|
2025 |
FINAL REPORT REAL-TIME TIDE MONITORING AND ANALYSIS FOR CPOC ADE-J OFFSHORE STRUCTURE (JACKET) LOADOUT OPERATION
AT MMHE EAST YARD, PASIR GUDANG, JOHOR.
9TH MAY TO 12TH MAY 2025
Clasified/Technical Report CO-AUTHOR
|
2025 |
FINAL REPORT REAL-TIME TIDE MONITORING AND ANALYSIS FOR CPOC ADD-J OFFSHORE STRUCTURE (JACKET) LOADOUT OPERATION AT MMHE EAST YARD, PASIR GUDANG, JOHOR. (CPOC-10-ADD-J) 23RD - 26TH MAY 2025
Clasified/Technical Report CO-AUTHOR
|
2025 |
REAL-TIME TIDE MONITORING AND ANALYSIS FOR CPOC ADE-J OFFSHORE STRUCTURE (JACKET) LOADOUT OPERATION AT MMHE EAST YARD, PASIR GUDANG, JOHOR. (CPOC-08-ADE-J) 16TH MAY TO 19TH MAY 2025
Clasified/Technical Report CO-AUTHOR
|
2025 |
FINAL REPORT REAL-TIME TIDE MONITORING AND ANALYSIS FOR CPOC JKC-T OFFSHORE STRUCTURE (TOPSIDE) LOADOUT OPERATION AT MMHE WEST YARD, PASIR GUDANG, JOHOR.
Clasified/Technical Report CO-AUTHOR
|
2025 |
FINAL REPORT REAL-TIME TIDE MONITORING AND ANALYSIS FOR CPOC ADC-T OFFSHORE STRUCTURE (TOPSIDE) LOADOUT OPERATION AT MMHE WEST YARD, PASIR GUDANG, JOHOR
Clasified/Technical Report CO-AUTHOR
|
2024 |
FINAL REPORT BATHYMETRY SURVEY AT MMHE EAST YARD PASIR GUDANG, JOHOR.
Clasified/Technical Report CO-AUTHOR
|
2024 |
FINAL REPORT TIDE MONITORING FOR ROSMARI MARJORAM JACKET LAND PULL AND LOADOUT CAMPAIGN AT MMHE WEST YARD (QUAY 6),
PASIR GUDANG, JOHOR
Clasified/Technical Report CO-AUTHOR
|
2024 |
FINAL REPORT BATHYMETRY SURVEY AT MMHE WEST YARD PASIR GUDANG, JOHOR.
(AREA: 1500M X 500M)
Clasified/Technical Report CO-AUTHOR
|
2024 |