FINAL REPORT TIDE MONITORING FOR SK408W JERUN CPP TOPSIDE LOADOUT CAMPAIGN AT MMHE WEST YARD (QUAY 7), PASIR GUDANG, JOHOR.
Clasified/Technical Report CO-AUTHOR
|
2024 |
FINAL REPORT TIDE MONITORING FOR SCIENTIFIC TIDAL PARAMETERS ANALYSIS AT JABATAN LAUT FERRY TERMINAL JETTY MINYAK BEKU, BATU PAHAT, JOHOR (PERIOD OF OBSERVATIONS 30 DAYS: 1ST APRIL 2024 TO 30TH APRIL 2024)
Clasified/Technical Report CO-AUTHOR
|
2024 |
FINAL REPORT BATHYMETRY SURVEY AT MMHE WEST YARD PASIR GUDANG, JOHOR.
(AREA: 1500M X 500M)
Clasified/Technical Report CO-AUTHOR
|
2024 |
FINAL REPORT REAL-TIME TIDE MONITORING
FOR SK408W JERUN CPP TOPSIDE LOADOUT CAMPAIGN AT MMHE WEST YARD (QUAY 7),
PASIR GUDANG, JOHOR
Clasified/Technical Report CO-AUTHOR
|
2024 |
FINAL REPORT BATHYMETRY SURVEY AT MMHE EAST YARD PASIR GUDANG, JOHOR.
Clasified/Technical Report CO-AUTHOR
|
2024 |
FINAL REPORT TIDE MONITORING FOR ROSMARI MARJORAM JACKET LAND PULL AND LOADOUT CAMPAIGN AT MMHE WEST YARD (QUAY 6),
PASIR GUDANG, JOHOR
Clasified/Technical Report CO-AUTHOR
|
2024 |
FINAL REPORT
(WORK DONE REPORT)
REAL-TIME TIDAL MONITORING FOR JERUN JACKET LAND PULL & LOADOUT OPERATION AT MMHE WEST YARD (QUAY 7), PASIR GUDANG, JOHOR.
(PERIOD OF OBSERVATION 2 DAYS: 31 MAY 2023 & 3 JUNE 2023
Clasified/Technical Report CO-AUTHOR
|
2023 |
FINAL REPORT (WORK DONE REPORT)
2 DAYS REAL-TIME TIDAL MONITORING AT MMHE WEST YARD (QUAY 6), PASIR GUDANG, JOHOR FOR KASAWARI CPP TOPSIDE LAND PULL & LOADOUT PROJECT (PERIOD OF OBSERVATION: 25TH - 26TH JULY 2023)
Clasified/Technical Report CO-AUTHOR
|
2023 |
FINAL REPORT (WORK DONE REPORT) TIDAL MONITORING AT MMHE WEST YARD (QUAY 7), PASIR GUDANG, JOHOR FOR JERUN PROJECT PERIOD OF 12 DAYS TIDE OBSERVATIONS (19TH APRIL 2023 TO 30TH APRIL 2023)
Clasified/Technical Report CO-AUTHOR
|
2023 |
FINAL REPORT (WOR DONE REPORT)
TIDAL MONITORING AT MMHE WEST YARD (QUAY 6), PASIR GUDANG, JOHOR FOR KASAWARI PROJECT
(14 DAYS OF TIDE OBSERVATION: 23RD DECEMBER 2022 TO 6TH JANUARY 2023) - REV 01
Clasified/Technical Report CO-AUTHOR
|
2023 |
ROCK RESERVE ESTIMATION AND VIABILITY OF PROPOSED QUARRY SITE: DI ATAS SEBAHAGIAN KOMPARTMENT 43, HS BUKIT PERAK, MUKIM PADANG PELIANG, DAERAH PENDANG, KEDAH DARUL AMAN
Clasified/Technical Report CO-AUTHOR
|
2023 |
FINAL REPORT (WORK DONE REPORT)
14 DAYS TIDAL MONITORING AT MMHE WEST YARD (QUAY 6), PASIR GUDANG, JOHOR FOR KASAWARI CPP TOPSIDE PROJECT. (PERIOD OF OBSERVATION: 3RD – 17TH JULY 2023)
Clasified/Technical Report CO-AUTHOR
|
2023 |
FINAL REPORT BATHYMETRY SURVEY AT LABUAN SHIPYARD & ENGINEERING SDN. BHD. JETTY FT. LABUAN, MALAYSIA
Clasified/Technical Report CO-AUTHOR
|
2023 |
FINAL REPORT (WORK DONE REPORT)
2 DAYS REAL-TIME TIDAL MONITORING AT MMHE WEST YARD (QUAY 6), PASIR GUDANG, JOHOR FOR KASAWARI CPP JACKET LOADOUT PROJECT
(PERIOD OF OBSERVATION: 29TH - 30TH JANUARY 2023)
Clasified/Technical Report CO-AUTHOR
|
2023 |
SENTOSA SOUND OF VESSEL 3D MODELLING SURVEY USING TERRESTRIAL LASER SCANNER (TLS) AND STRUCTURE FROM MOTION (SFMD) USING DRONE
Clasified/Technical Report CO-AUTHOR
|
2022 |
DEFECT INSPECTION AND MONITORING FOR SUSPENDED SLAB
AT FGV PASIR GUDANG, JOHOR DARUL, TAKZIM
Clasified/Technical Report CO-AUTHOR
|
2022 |
FINAL REPORT REAL-TIME TIDE MONITORING AT QUAY 6 MMHE WEST YARD, PASIR GUDANG, JOHOR FOR KASAWARI KSDP-A TOPSIDE LOADOUT
Clasified/Technical Report CO-AUTHOR
|
2021 |
FINAL REPORT TIDAL MONITORING AT MMHE WEST YARD (QUAY 6), PASIR GUDANG, JOHOR FOR KASAWARI KSDP-A JACKET LOADOUT
Clasified/Technical Report CO-AUTHOR
|
2021 |
FINAL REPORT HYDROGRAPHIC SURVEY FIELD DATA COLLECTION SERVICES
Clasified/Technical Report CO-AUTHOR
|
2021 |